Project description

After the production area had been extended and the canteen had moved to the new building this vacant area was converted into two open-plan offices with a meeting room and a small kitchen. A glass wall with a fitted cupboard which can be used from both sides divides up and at the same time separates the offices from each other.

After the reconstruction it was time to renovate the toilets: New contemporary toilets for males and females were installed on two floors. 

Work phases 1-3 and 5-8

trenner

Contact information

Plewka Architekt
Joseph-Kürschner-Straße 6a
99817 Eisenach

phone.: +49 (0) 3691 - 70 83 80
fax: +49 (0) 3691 - 70 83 78

e-mail: info@plewka-architekt.de

Contact us




Mit der Absendung des Kontaktformulars erklären Sie sich damit einverstanden, dass Ihre Daten zur Beantwortung und Bearbeitung Ihres Anliegens verwendet werden. Weitere Informationen und Widerufshinweise finden Sie in unserer Datenschutzerklärung.


What is the sum of 9 and 6?